Legal Notices
Recent Ordinances:
ATV routes are open as of 5/29/2025
[ ATV/UTV map ] Map shows Town of Ottawa open roads in green.
(includes both sides of the roads except between Municipal boundary lines on Mill Pond Road and Piper Road)
All other roads are NOT ATV/UTV routes. No County Roads or State Highways are open. Parry Road and Waterville Road are not open.
[ Restricting Wake Enhancement Ordinance ] 4/14/2025
[ Noise Ordinance ] 9/10/2024
[ ATV/UTV Ordinance ] 9/10/2024 NO County Roads or State Highways are open.
[ No Parking ] 5/12/2025 to add no parking to portions of Gramling Lane
****************************************************************************************************************************************
Public Meeting Announcement
- Event: Community Public Meeting
- Date: July 16th, 2025
- Time: 5:00 PM – 7:00 PM
- Location: Ottawa Town Hall o Address: W360S3337 State Road 67, Dousman, WI 53118-9709
Meeting Purpose
- The Wisconsin Department of Transportation has recently identified several roads within the state that may qualify for inclusion in the federally funded High Risk Rural Road Program (HRRRP), a component of the Highway Safety Improvement Program. https://highways.dot.gov/safety/hsip/hsip-special-rules/high-risk-rural-roads-hrrr
- HRRRP is dedicated to incorporating low-cost countermeasures for improving hazardous run-off-the-road situations.
- One important Waukesha County road, CTH Z, extending from Northey Road to Scuppernong Creek, is ranked as the 6th highest priority in the state for HRRRP safety improvements.
- During the HRRRP evaluation period (2017-2021) CTH Z experienced 22 total crashes, including 11 run off the road crashes, 1 fatality and 6 serious injury crashes impacting 9 people.
- The Waukesha County Department of Public Works is considering applying for federal HRRRP funding to enhance the safety on CTH Z through the installation of new pavement surface, centerline rumble strips, improved pavement markings, increased and improved signage, and the removal of trees and vegetation within the roadway clear zone safety area.
- Before applying for federal HRRRP funding, Waukesha County would like to share project concepts, gather public feedback and measure public support for the proposed project.
We encourage community participation and involvement. Active participation and communication are critical to the success of this safety initiative, ensuring safer and more efficient roadways for everyone.
Questions about the project or public meeting can be directed to Ethan Moser, Waukesha
County Project Engineer @ 262-548-7748 or email to EMoser@WaukeshaCounty.gov
*****************************************************************************************************************************
N:\PRKANDLU\Planning and Zoning\Community Assistance\T OTTAWA\Town Land Use Plan\2009 Comp Dev Plan Smart Growth compliance update\Annual Amendments\2020 Annual Amendments\2020 PV Town of Ottawa CDP public hearing notice.docx
CDP BOUNDARY UPDATE MAP
|